주메뉴 바로가기 본문 바로가기
Contact us

People working up for uncharted values

Together with KLES, Forward with KLES

Today happy KLES, navigating happier tomorrows

SCROLL DOWN

Notice

Development of automatic Sling-Rod Load Measurement & Distribution System
  • Writer : KLES
  • Created : 2017.02.23
  • Views : 2580
img
 
Development of automatic Sling-Rod load measurement and distribution system

 

Since November 2014, in collaboration with Big-five Genco’s in Korea, KLES have been working on the development of a load balance maintaining system of boiler sling rods for thermal power plant, which is aimed to stabilize the boiler operations by measuring and rectifying the movements in terms of boiler loads during operation, and calibrating such loads in realtime, so that the system would contribute to enhance power generation efficiencies and reduce maintenance costs in effect.

 

More details in Korean ☞

TOP